Well i think i can officially say that the gecko is underway.
terry gave me the keys to the PCS shop this afternoon, and i arrived prompty at 8:20 after school to immediately begin "work" on the car.
The first day of the build process was a simple one. i laid out all of my metal on the floor, roughly laid out in the shape of a finished gecko chassis. it gives a very loose idea of the final product, but a very good idea for the size. all parts were labeled and stored away again so i can begin cuts soon.
it was an awesome feeling having a 3d representation of the car wrapped around me.
pics from day one (thats mazer in the pics):
Monday, March 16, 2009
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment