Sunday, January 4, 2009

moving day

all packed up in teh back of my car--everything I own dedicated to the gecko project. nearly a thousand bucks worth of stuff already...

here's what i have now:

-1000cc four cylinder engine out of a Honda CBR1000RR sport bike
-ECU module for the engine
-two stock airboxes with dual stage fuel injection fuel rails
-ignition cylinder with keys
-8.8 posi differential
-kick stand sensor switch
-airbox inlet pipe

key components i need in the near future:

-STEEL!
-front uprights/hubs
-steering rack
-wiring harness for the engine
-jet power commander
-fuel pump/lines (and prolly a fuel tank for that matter)
-battery

All packed up and ready to go:

No comments: